Rules for suspending crane operations in windy conditions and providing breaks to workers will change.
“Operative Information Center-OMM” reports that President Ilham Aliyev has signed a law amending the Labor Code.
Under the new law, when wind strength is between 6 and 8 on the Beaufort scale, work with cranes operated on land will be permitted only in cases specified in the cranes’ technical passports.
All work involving the specified cranes must be suspended whenever wind strength exceeds 8. In view of this provision, all work with cranes operated on land will be suspended when wind strength reaches 6 or higher.
Previously, all crane work on land was suspended when wind strength reached 6 or higher.