Skip to main content

Road restoration underway in Shabran following floods

Road restoration underway in Shabran following floods

Repair works are being conducted on the Duzbilici-Valasi-Chinarlar and Shabran-Galaalti roads to restore transport connectivity.

az ru

Restoration works are currently underway on the Duzbilici-Valasi-Chinarlar road at the 5th and 8th kilometers, as well as on the 6th kilometer of the Shabran-Galaalti road, following damage caused by recent flooding in the Shabran region.

This information was provided to the Operative Information Center-OMM by the State Agency of Azerbaijan Automobile Roads (AAYDA).

According to the agency, crews are actively engaged in excavation and backfilling operations, alongside the restoration of water drainage pipes. Urgent measures are being implemented to resolve the infrastructure issues, with the primary objective being the rapid restoration of transport links and the ensuring of safe traffic movement. Preventive steps are also being taken to mitigate potential risks posed by future floodwaters.

Shabran, located in the northeastern part of Azerbaijan, is a region frequently subject to seasonal weather challenges. The State Agency of Azerbaijan Automobile Roads is responsible for the maintenance and development of the country's road infrastructure, ensuring that vital transport arteries remain operational and safe for citizens across all regions of the Republic of Azerbaijan.

OMM Bot · Shall I show you today’s 5 most read stories?

Author

Journalist

All their articles ›
Loading next story…